Case Study: Plant/Unit System Expansion

A leading US oil refinery needed to perform a QA/QC oversight on a multi-million dollar facility rework project. The specifications of the project required inspectors to visit manufacturing facilities across the United States and Europe, including Spain, Germany and Italy.

Solution:

BAY Technical was called to oversee the global requirements and coordinate efforts between inspectors and engineers. We attended pre-fabrication alignment meetings with the fabricators and the inspectors who were following and reporting on the fabrication process. We worked directly with the project engineers to ensure the fabricators were performing as specified by our client. We also visited the international shops to assist the inspectors and assure that the components were being fabricated in accordance with the client's engineering requirements.